Pápa
The first operation contract of Dalkia Energia Zrt. based on Dalkia-type construction was signed in 1993 with the then 360-bed Gróf Esterházy Hospital of Pápa. In the frame of the 10-year cooperation, Dalkia Energia undertook the full reconstruction of the boiler room, financed the reconstruction, set up the team for the operation, energy supply and maintenance tasks. Settling the value of the investment was covered by the cost savings enabled by the efficient operation of the state-of-the-art system. When the initial term of the investment was over, the hospital signed a newer 10-year contract with Dalkia Energia, this time for full guarantee covering the equipment. The upgrading and efficient operation resulted in saving as much as 15–20% of energy consumption of the hospital.
|
 |
|